EHS Guidelines logo

EHS Guidelines

Workplace Safety, OSHA Guides, First Aid & EHS Study Resources

  • Home
  • EHS Policies
  • EHS Guidelines
  • OSHA Guidelines
  • First Aid
  • Fire Safety
  • ARAMCO
News Ticker
  • [ November 3, 2026 ] Electric Shock First Aid: Make the Scene Safe Before You Touch the Casualty First Aid
  • [ November 2, 2026 ] High Blood Sugar (Hyperglycaemia): Warning Signs and First Aid First Aid
  • [ November 1, 2026 ] Low Blood Sugar (Hypoglycaemia): Symptoms and First Aid for Diabetics First Aid
  • [ October 31, 2026 ] Diabetes Emergencies First Aid: Low and High Blood Sugar Explained First Aid
  • [ October 30, 2026 ] Stroke First Aid: Spot the Signs With FAST and Call at Once First Aid
HomeOSHA Guidelines

OSHA Guidelines

Dewatering hazards and control measures OSHA guide
OSHA Guidelines

Dewatering Hazards and Control Measures: OSHA Guide

September 1, 2026 Aiman Shazadi 0

TL;DR Dewatering in construction excavations is governed by 29 CFR 1926.651(h). Employees shall not enter an excavation with accumulated or accumulating water unless adequate precautions are in place. The six primary dewatering hazards are: soil […]

Construction safety risk assessment OSHA guide
OSHA Guidelines

Construction Safety Risk Assessment: OSHA Guide (29 CFR 1926)

August 28, 2026 Aiman Shazadi 1

TL;DR A construction safety risk assessment is the employer’s structured process for identifying, evaluating, and controlling jobsite hazards before work begins. 29 CFR 1926.20(b) requires frequent and regular inspections by a competent person; 29 CFR […]

PSM contractor safety
OSHA Guidelines

Contractor Safety Under 29 CFR 1910.119(h)

August 27, 2026 Aiman Shazadi 0

PSM contractor safety divides important duties between the host employer and the contract employer when contractors perform work on or adjacent to a covered process. Under 29 CFR 1910.119(h), the host evaluates and communicates process-related conditions, while […]

PSM Compliance Audit
OSHA Guidelines

PSM Compliance Audits Under 29 CFR 1910.119(o)

August 20, 2026 Aiman Shazadi 1

A PSM compliance audit evaluates whether the procedures and practices developed under 29 CFR 1910.119 are adequate and are being followed. Under paragraph 1910.119(o), the employer must certify that this evaluation occurs at least every three years. The […]

OSHA 1910.119 Appendix A
OSHA Guidelines

Appendix A to 1910.119: Highly Hazardous Chemicals and Threshold Quantities

August 17, 2026 Aiman Shazadi 1

osha-1910-119-appendix-a OSHA 1910.119 Appendix A provides the threshold quantities used for one important PSM coverage route. The official table identifies each entry by chemical name, Chemical Abstracts Service number where available, and threshold quantity in […]

PSM Block Flow Diagram
OSHA Guidelines

Block Flow Diagrams and Process Flow Diagrams for PSM

August 16, 2026 Aiman Shazadi 0

A PSM block flow diagram or simplified process flow diagram provides a visual overview of the covered process and its major streams. Under 29 CFR 1910.119(d)(2)(i)(B), process-technology information must include a block flow diagram or simplified process flow […]

Hot Work Permit
OSHA Guidelines

Hot Work Permit Requirements Under 29 CFR 1910.119(k)

August 15, 2026 Aiman Shazadi 0

Hot Work Permit Requirements Under 29 CFR 1910.119(k) A PSM hot work permit is required for hot work performed on or near a process covered by OSHA Process Safety Management. Under 29 CFR 1910.119(k), the permit must document […]

OSHA 3132 Process Safety Management
OSHA Guidelines

PSM Part 1 – Comprehensive Guide to OSHA 3132 Process Safety Management

August 10, 2026 Aiman Shazadi 1

Introduction to Process Safety Management (OSHA 3132) Process Safety Management (PSM) is a regulatory framework established by the Occupational Safety and Health Administration (OSHA) under standard OSHA 3132 and codified in 29 CFR 1910.119. The […]

Site managers and engineers reviewing the hazard identification guide at an industrial construction site.
OSHA Guidelines

Hazard Identification & Risk Assessment (HIRA) for Rebar Fixing & Assembly Work

April 10, 2026 Aiman Shazadi 1

Welcome to our highly specific safety protocol document. Specifically, executing structural base operations safely requires targeted planning. Therefore, this document provides the exact Hazard Identification & Risk Assessment (HIRA) for Rebar Fixing & Assembly Work. […]

Who Is Responsible for Scaffold Safety Under OSHA Regulations?
OSHA Guidelines

Who Is Responsible for Scaffold Safety Under OSHA Regulations?

March 6, 2026 Aiman Shazadi 0

Introduction Scaffolding is widely used in construction, maintenance, and industrial projects, but it also presents significant fall and structural hazards if not properly managed. Because of these risks, the Occupational Safety and Health Administration (OSHA) […]

Posts pagination

1 2 »

Recent Comments

  1. Electric Shock First Aid: 7 Safe Steps Before You Touch on DRABC Primary Survey: The Basic Life Support Flow Chart Explained
  2. Eye Injury First Aid: 7 Essential Steps to Protect Sight on Eye Burn First Aid: Chemical Burns, Smoke, Welder’s Flash and Snow Blindness
  3. High Blood Sugar First Aid: 6 Warning Signs and Steps on Recovery Position: A Step by Step Guide
  4. Eye Burn First Aid: 6 Essential Steps for Chemical Burns on First Aid: Bleeding Type Treatment and Precaution
  5. Eye Injury First Aid: 7 Essential Steps to Protect Sight on First Aid: Bleeding Type Treatment and Precaution

Categories

  • ARAMCO
  • EHS Guidelines
  • EHS Policies
  • Fire Safety
  • First Aid
  • Method Statement
  • OSHA Guidelines
  • Preparation
  • Structural Guidelines

1st Office: Gulshan e hadeed, phase 2, Bin Qasim Karachi, Sindh, Pakistan 75010.
Email: [email protected]
Contact: +923002682860 , +923132682860

2nd Office: Internal market, building 2, office # 43, Al Kharj, Riyadh, Saudi Arabia.
Email: [email protected]
Contact +966532264325

Copyright © 2026 | MH Magazine WordPress Theme by MH Themes

We use cookies, including for advertising via Google AdSense. See our Privacy Policy for details.