EHS Guidelines logo

EHS Guidelines

Workplace Safety, OSHA Guides, First Aid & EHS Study Resources

  • Home
  • EHS Policies
  • EHS Guidelines
  • OSHA Guidelines
  • First Aid
  • Fire Safety
  • ARAMCO
News Ticker
  • [ November 3, 2026 ] Electric Shock First Aid: Make the Scene Safe Before You Touch the Casualty First Aid
  • [ November 2, 2026 ] High Blood Sugar (Hyperglycaemia): Warning Signs and First Aid First Aid
  • [ November 1, 2026 ] Low Blood Sugar (Hypoglycaemia): Symptoms and First Aid for Diabetics First Aid
  • [ October 31, 2026 ] Diabetes Emergencies First Aid: Low and High Blood Sugar Explained First Aid
  • [ October 30, 2026 ] Stroke First Aid: Spot the Signs With FAST and Call at Once First Aid
HomeEHS Guidelines

EHS Guidelines

PSM training requirements
EHS Guidelines

PSM Training Requirements Under 29 CFR 1910.119(g)

September 3, 2026 Aiman Shazadi 2

PSM training requirements are designed to ensure that employees involved in operating a covered process understand the process, its operating procedures, relevant hazards, emergency operations, and safe work practices. 29 CFR 1910.119(g) requires initial training, refresher training at […]

How to do a risk assessment in construction
EHS Guidelines

How to Do a Risk Assessment: Construction Safety Guide

August 30, 2026 Aiman Shazadi 1

TL;DR A risk assessment is a structured process for identifying hazards, evaluating the probability and severity of harm, and implementing controls before work begins. Under 29 CFR 1926 Subpart C and 29 CFR 1910.132(d), construction […]

Health and safety risk assessment template for construction
EHS Guidelines

Health & Safety Risk Assessment Template: Free Construction Guide

August 29, 2026 Aiman Shazadi 2

TL;DR A health and safety risk assessment template must document the task, hazard, who is at risk, likelihood, severity, risk rating, existing controls, and additional controls required – as mandated by 29 CFR 1910.132(d) and […]

Pre-Startup Safety Review
EHS Guidelines

Pre-Startup Safety Review Under 29 CFR 1910.119(i)

August 26, 2026 Aiman Shazadi 1

A pre-startup safety review (PSSR) is OSHA’s final readiness check before highly hazardous chemicals are introduced into a new covered process or a significantly modified process. Under 29 CFR 1910.119(i), the review must confirm design conformity, adequate procedures, […]

PSM hot work permit
EHS Guidelines

Hot Work Permit Requirements Under 29 CFR 1910.119(k)

August 25, 2026 Aiman Shazadi 2

A PSM hot work permit is required for hot work performed on or near a process covered by OSHA Process Safety Management. Under 29 CFR 1910.119(k), the permit must document that applicable fire-prevention and protection requirements have been […]

PSM Mechanical Integrity
EHS Guidelines

Mechanical Integrity Under 29 CFR 1910.119(j)

August 24, 2026 Aiman Shazadi 0

PSM mechanical integrity is the system used to keep specified process equipment suitable, correctly installed, inspected, tested, maintained, and safe for its intended service. Under 29 CFR 1910.119(j), employers must establish written procedures, train maintenance employees, inspect […]

PSM Management of Change
EHS Guidelines

Management of Change Under 29 CFR 1910.119(l)

August 23, 2026 Aiman Shazadi 0

PSM management of change is the written system used to evaluate and control changes before they affect a covered process. Under 29 CFR 1910.119(l), an employer must establish and implement procedures for changes to process chemicals, technology, […]

PSM emergency planning
EHS Guidelines

Emergency Planning and Response Under 29 CFR 1910.119(n)

August 21, 2026 Aiman Shazadi 0

PSM emergency planning and response requires an employer to establish and implement an emergency action plan for the entire plant in accordance with 29 CFR 1910.38. Paragraph 1910.119(n) also requires the plan to include procedures for handling small releases […]

PSM Trade Secrets
EHS Guidelines

Trade Secrets and Employee Access Under 29 CFR 1910.119(p)

August 19, 2026 Aiman Shazadi 1

PSM trade secrets cannot be used to withhold information needed to perform specified Process Safety Management duties. Under 29 CFR 1910.119(p), employers must make all information necessary for designated PSM work available without regard to its possible […]

OSHA 1910.109
EHS Guidelines

OSHA 1910.109 Explosives, Blasting Agents and PSM Coverage

August 18, 2026 Aiman Shazadi 0

OSHA 1910.109 and Process Safety Management intersect most directly in paragraph 1910.109(k). Under 29 CFR 1910.109(k)(2) and (k)(3), the manufacture of explosives and the manufacture of pyrotechnics must comply with 29 CFR 1910.119. This is a narrow but […]

Posts pagination

1 2 … 7 »

Recent Comments

  1. Electric Shock First Aid: 7 Safe Steps Before You Touch on DRABC Primary Survey: The Basic Life Support Flow Chart Explained
  2. Eye Injury First Aid: 7 Essential Steps to Protect Sight on Eye Burn First Aid: Chemical Burns, Smoke, Welder’s Flash and Snow Blindness
  3. High Blood Sugar First Aid: 6 Warning Signs and Steps on Recovery Position: A Step by Step Guide
  4. Eye Burn First Aid: 6 Essential Steps for Chemical Burns on First Aid: Bleeding Type Treatment and Precaution
  5. Eye Injury First Aid: 7 Essential Steps to Protect Sight on First Aid: Bleeding Type Treatment and Precaution

Categories

  • ARAMCO
  • EHS Guidelines
  • EHS Policies
  • Fire Safety
  • First Aid
  • Method Statement
  • OSHA Guidelines
  • Preparation
  • Structural Guidelines

1st Office: Gulshan e hadeed, phase 2, Bin Qasim Karachi, Sindh, Pakistan 75010.
Email: [email protected]
Contact: +923002682860 , +923132682860

2nd Office: Internal market, building 2, office # 43, Al Kharj, Riyadh, Saudi Arabia.
Email: [email protected]
Contact +966532264325

Copyright © 2026 | MH Magazine WordPress Theme by MH Themes

We use cookies, including for advertising via Google AdSense. See our Privacy Policy for details.